| # | Parameter | BW-117 |
|---|---|---|
| 1 | Main Press | 10 HP, 3 Ph |
| 2 | Vibrators | 2 HP, 3 Ph + 0.5 HP, 3 Ph |
| 3 | Conveyor | 2 HP, 3 Ph |
| 4 | Pan Mixer | 15 HP, 3 Ph |
| 5 | Hydraulic Hopper Power Pack | 2 HP, 3 Ph |
| 6 | Total Connected Load | 32 HP |
| 7 | Production Capacity | 10,000 bricks / shift |
| 8 | Shed Size | 15' × 60' × 15' height |
| 9 | Land Required | 3,500 sq.m. |
| 10 | Labour | 2 skilled, 10 unskilled |
| 11 | Pallet Size | 475 × 585 × 16 mm |
| 12 | Hydraulic Oil | Grade 68 — 250 litre |
Source: CARD — BW-117 product card, with capacity and pallet size confirmed against the client's notes file.
Every figure below is read directly from Buildwell's own product-on-pallet CAD drawings for the BW-117 — the same drawings issued with the machine. Each tile shows how many finished units come off a single press stroke.




Units per hour and per shift depend on cycle time, mix and curing arrangement at your site. Ask our team for a shift projection for your chosen size.
Simultaneous top pressure and table vibration compacts the mix to a uniform density right through the unit — not just at the surface.
Moulds swap out to change product size and shape, so one press covers several product families without a second machine.
Mould boxes and tamper heads are built from hardened steel to hold dimensional tolerance across long production runs.
A dedicated hydraulic power pack drives the press cycle, with grade-68 hydraulic oil and filtration on the return line.
The pan mixer is matched to the press cycle time so the machine is never waiting on mix, and the mix is never sitting.
Green units leave the press on a steel pallet and travel out on conveyor, so they are never lifted by hand while wet.
A separate colour mixer drum lays a pigmented face on pavers, giving colour where it is seen without pigmenting the full section.
Cycle, vibration time and press dwell are set at the panel, so output quality does not depend on operator feel.
Foundation and shed layout drawings are issued ahead of dispatch so erection is planned before the machine arrives.
Your operators are trained on operation, mould change and routine maintenance as part of commissioning.
Direct from the manufacturer. No reseller markup, no call centre — your enquiry reaches our Bhuj works.
Not quite the right output? Compare the rest of the Buildwell range.

A tighter footprint, a bigger mould.
View Machine
Nine at a time, on a 920 mm pallet.
View Machine
25,000 bricks a shift, with the stacker running.
View MachineTell us your target output and site size. Our engineers will come back with a machine recommendation, a layout plan and a price — no reseller in between.